REPP logo banner adsolstice ad
site map
Google Search REPP WWW register comment
home
repp
energy and environment
discussion groups
calendar
gem
about us
employment
 
REPP-CREST
1612 K Street, NW
Suite 202
Washington, DC 20006
contact us
discussion groups
efficiencyefficiency hydrogenhydrogen solarsolar windwind geothermalgeothermal bioenergybioenergy hydrohydro policypolicy
Gasification Archive for September 2002
114 messages, last added Tue Nov 26 17:18:29 2002

[Date Index][Thread Index]

Re: GAS-L: Engine Experience




Dear All 

I dont think there are big problems on the engine side. 
If the gas is clean the engine can operate as long as on natural gas.

If you need references contact Jenbacher.

I think the effort should be concentrated on gas quality and handling. 

Thomas






----- Original Message ----- 
From: "Terry Dixon" <t.dixon@sri.org.au>
To: <gasification@crest.org>
Sent: Sunday, September 01, 2002 8:45 PM
Subject: GAS-L: Engine Experience


> Dear Tom and All,
> 
> Ah ah ah ah !!!  The sobering questioning of hard (and harsh !) reality !
> Excellent.   The inevitable shift in focus from the R&D perspective to the
> commercial reality perspective.  I'll be very interested to read the
> responses to this one.  For me (in the Australian sugar industry context,
> and I dare say in a similar context for many others), the issues that you
> question, of annual operating hours and maintenance period hours, are
> CRUCIAL for commercial reality and viability long term.  Unless
> gasification can deliver at 4500+ hours, maybe 8000+, continuous (no
> shutdowns), and overhaul of 8000+ hours, then forget it !!!
> 
> Terry Dixon
> Sugar Research Institute
> AUSTRALIA
> 
> ----- Forwarded by Terry Dixon/SRI on 02/09/2002 04:34 -----
>                                                                                                                    
>                     "Tom Miles"                                                                                    
>                     <tmiles@trmile       To:     <gasification@crest.org>                                          
>                     s.com>               cc:                                                                       
>                                          Subject:     GAS-L: Engine Experience                                     
>                     01/09/2002                                                                                     
>                     16:05                                                                                          
>                                                                                                                    
>                                                                                                                    
> 
> 
> 
> 
> What has the experience been with engines and gasifiers? What are the
> maintenace requirements? What is the typical annual use, 2000 hours? Are
> there any that operate 6000 to 8000 hours per year? What is the expected
> life? What are the actual maintenance intrevals? What facilities and
> equipment are necessary for engine maintenance that are different than for
> automotive or diesel power generation? What engines (make and model) work
> well: Waukesha? Caterpiller? Lister?
> 
> The most used engines for producer gas seem to be modified natural gas or
> LP engines or diesels that are run as dual fueled. Are oil and air filter
> change intrevals the same for producer gas as for LP? Every 150 hours? What
> other maintenance needs to be done?What is the expected engine life
> compared with actual engine life for LP or duel fueled diesels on producer
> gas? Can we expect an overhaul with producer gas after 2000 hours? Is
> engine life 10000 hours? After than what needs to be done?
> 
> What has the experience been with converting existing diesels to dual
> fueled applications? Good? Bad? What works and what doesn't work?
> 
> What is a practical genset size? Do the 500 kWe engine-gensets that we have
> seen promoted actually survive? If you were doing distributed generation at
> 200 kWe what would you use? Four 50 kWe or larger gensets?
> 
> What's the experience with derating? What's the actual power production for
> an engine rated for LP or diesel? If you were sizing a new system for 200
> kWe how would you specify the engine?
> 
> We understand from the more successful gasifier-genset suppliers that
> engine applications need a well organized "support system." What support
> does a 50-200 kWe gasogen need?
> 
> Moisture in the fuel. If I make "bad" gas because of wet fuel does the
> engine care? What kinds of problems result from wet fuel? What range of
> gasifier fuel moisture can an engine tolerate without excessive derating?
> 
> Where does one go for engine experience or information about the use of
> engines with gasifiers(what documents or web links)? Are there test block
> benchmark performance tests for producer gas?
> 
> These are a lot of ignorant questions from one who is often asked for
> direction. Until I use a gasogen to keep my own electronics on standby I'll
> have to rely on the experience of others. Thank you for your contributions.
> 
> Kind regards,
> 
> Tom Miles
> 
> 
> 
> 
> -------------------------------
> 
> This email message (including any file attachments transmitted with it) is
> for the sole use of the intended recipient(s) and may contain confidential
> and privileged information.  Any unauthorised alteration, disclosure or
> distribution is prohibited.  If you received this email in error, please
> notify the sender by return email and destroy all copies of the original
> message.
> 
> Any confidentiality or legal professional privilege is not waived or lost
> by any mistaken delivery of the email.
> 
> -------------------------------
> 
> 
> 
> -
> Gasification List Archives:
> http://www.crest.org/discussion/gasification/200202/
> 
> Gasification List Moderator:
> Tom Reed, Biomass Energy Foundation,  Reedtb2@cs.com
> www.webpan.com/BEF
> List-Post: <mailto:gasification@crest.org>
> List-Help: <mailto:gasification-help@crest.org>
> List-Unsubscribe: <mailto:gasification-unsubscribe@crest.org>
> List-Subscribe: <mailto:gasification-subscribe@crest.org>
> 
> Sponsor the Gasification List: http://www.crest.org/discuss3.html
> -
> Other Gasification Events and Information:
> http://www.bioenergy2002.org
> http://www.crest.org/articles/static/1/1010424940_7.html Bioenergy
> http://www.crest.org/articles/static/1/1011975339_7.html Gasification
> http://www.crest.org/articles/static/1/1011975672_7.html Carbon
> 


-
Gasification List Archives:
http://www.crest.org/discussion/gasification/200202/

Gasification List Moderator:
Tom Reed, Biomass Energy Foundation,  Reedtb2@cs.com
www.webpan.com/BEF
List-Post: <mailto:gasification@crest.org>
List-Help: <mailto:gasification-help@crest.org>
List-Unsubscribe: <mailto:gasification-unsubscribe@crest.org>
List-Subscribe: <mailto:gasification-subscribe@crest.org>

Sponsor the Gasification List: http://www.crest.org/discuss3.html
-
Other Gasification Events and Information:
http://www.bioenergy2002.org
http://www.crest.org/articles/static/1/1010424940_7.html Bioenergy
http://www.crest.org/articles/static/1/1011975339_7.html Gasification
http://www.crest.org/articles/static/1/1011975672_7.html Carbon