 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
REPP-CREST
1612 K Street, NW
Suite 202
Washington, DC 20006
contact us
|
|
 |
|
 |
|
 |
| Greenbuilding Archive for October 2001 |
 |
| 221 messages, last added Tue Nov 26 17:26:03 2002 |
[Date Index][Thread Index]
[GBlist] vapor barrier question
Y'all,
Here is a curve-ball question for you.
I am about to install blown cellulose in the attic of a home in
Far-Northern California, on top of the existing 2 layers of 3.5 inch
fiberglass batts. I am at 3,500 feet elevation, with somewhat hot summers
and cold winters.
When the original insulation was installed, they put one layer of 3.5 inch
foil-faced batt with the foil vapor barrier down, as instructions and
common knowledge agree it should be. Then they put the second layer with
the foil barrier facing the attic, for unknown reasons, (perhaps they
thought it would act as a radiant heat shield?).
My question is how to proceed. Advice from local insulation contractors has
conflicted:
1) tear off the top vapor barrier (dusty, nasty job)
2) slash the top foil with a knife, then blow on top;
3) leave it as-is and blow right over the whole sandwich.
Comments?
Thomas
Thomas Deerfield
The Shasta Group
PO Box 560
Mount Shasta, CA 96067
______________________________________________________________________
This greenbuilding dialogue is sponsored by REPP/CREST, creator of
Solstice http://www.crest.org, and BuildingGreen, Inc., publisher of
Environmental Building News and GreenSpec http://www.BuildingGreen.com
______________________________________________________________________
 |
 |
|