REPP logo banner adsolstice ad
site map
Google Search REPP WWW register comment
home
repp
energy and environment
discussion groups
calendar
gem
about us
employment
 
REPP-CREST
1612 K Street, NW
Suite 202
Washington, DC 20006
contact us
discussion groups
efficiencyefficiency hydrogenhydrogen solarsolar windwind geothermalgeothermal bioenergybioenergy hydrohydro policypolicy
Greenbuilding Archive for January 2002
564 messages, last added Tue Nov 26 17:26:27 2002

[Date Index][Thread Index]

Re: [GBlist] building inspector



Ask for his supervisor and begin your walk up the chain of command.  Remain calm, positive and persistant.
 
SBT Designs
25840 IH-10 West #1
Boerne, Texas 78006
210-698-7109
FAX: 210-698-7147
www.sbtdesigns.com
----- Original Message -----
Sent: Thursday, January 17, 2002 1:47 PM
Subject: [GBlist] building inspector

What does one do when the building inspector revokes a permit, but does not give a list of problems to correct?  Can he wait as long as he wants to? 
 
He came out Tuesday (it was not scheduled), sent our crew home and then put up a sign -- but he will not give us a list of complaints so we cannot fix it.  When we ask he says he doesn't know enough about the product (engineered wood).  He has given us no idea when he might come through with the list.  He said he would talk to the manufacturer -- who has not been at all helpful to us.  I am afraid to challenge him much as he could make the rest of the job very difficult for us.
 
Thanks,
Jeannie