Specifications from the Gasification Discussion List

DRAFT SPECIFICATIONS From the Renewable Energy Policy Project (REPP) Gasification Discussion List

I. PERFORMANCE REQUIREMENTS AND BENCHMARKS

A. Electrical Output: 300 kWe

B. Thermal Output:

C. Capacity Factor, Availability, Operating Hours

D. Economic Targets, $/kWh, $/kcal

II. MAJOR COMPONENTS

A. FUEL PREPARATION: SIZING, Densification

B. FUEL PREPARATION: DRYING

C. GASIFIER AND FEED SYSTEM

D. ASH HANDLING

E. HOT GAS COOLING

F. GAS CLEANING

G. ENGINE-GENERATOR SYSTEM

H. OTHER THERMAL/ELECTRICAL SYSTEMS (e.g. ORMAT, SPILLING)

I. HEAT SYSTEM

J. WASTEWATER TREATMENT

K. GAS HANDLING, COMPRESSION, STORAGE

L. EMISSIONS

III. SAMPLE SUPPLER SYSTEM SPECIFICATIONS FOR 200 kWe