I. PERFORMANCE REQUIREMENTS AND BENCHMARKS
A. Electrical Output: 300 kWe
- 320 kWe Full Load Required on Dual Fuelled Diesel
- Factory load or connect to grid (or mini grid)?
B. Thermal Output:
- 225 kWth
- 85 C to Dry Kilns, Accumulator or District Heat Distribution
C. Capacity Factor, Availability, Operating Hours
- 6000 hours at 300 kWe = 6000/8760 = 68% capacity factor
D. Economic Targets, $/kWh, $/kcal
II. MAJOR COMPONENTS
A. FUEL PREPARATION: SIZING, Densification
B. FUEL PREPARATION: DRYING
C. GASIFIER AND FEED SYSTEM
D. ASH HANDLING
E. HOT GAS COOLING
F. GAS CLEANING
- Measuring Gasifier Tars: Draft Standard, www.tarweb.net Paul de Wild, ECN September 2005
- Evolution of Gas Cleaning, Kari Salo IEA Task WS2 October 2004
- Formation, Decomposition and Cracking of Tars in Gasification Danish Technological University April 2005
- Gas Cleaning for Staged Gasifiers, Claus Hindsgaul, DTU, GasNET meeting autum 2002, Strasbourg.
- Low Temperature Particle Filtration of Wood Gas with Low Tar Content Claus Hindsgaul, Ulrik Henriksen and Jens Dall Bentzen. 12th European Conference and Technology Exhibition on Biomass for Energy, Industry and Climate Protection. Amsterdam June 2002, pp. 494-497.
- Conditioning of Producer Gas Chandrakant Turare
- Tar Decomposition with Catalysts, VTT
- Guideline for Standardized Tar Measurement tarweb.nt (BTG)
- BioHeatpipe Reformer, EC FP5
G. ENGINE-GENERATOR SYSTEM
H. OTHER THERMAL/ELECTRICAL SYSTEMS (e.g. ORMAT, SPILLING)
I. HEAT SYSTEM
J. WASTEWATER TREATMENT
K. GAS HANDLING, COMPRESSION, STORAGE
L. EMISSIONS
III. SAMPLE SUPPLER SYSTEM SPECIFICATIONS FOR 200 kWe
Suggestions welcome