Table 6. Capital Costs in Texas Example

Year Capacity Added
During Year
(MW)
Total Installed
Capacity at End
of Year (MW)
Assumed Cost
(per kW)
Installed Capital
Cost (in millions)
Cumulative
Installed Capital
Cost (in millions)
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
10
31
61
107
183
305
381
381
458
534
610
40
71
132
238
421
726
1,108
1,489
1,946
2,480
3,090

$1,000
$950
$900
$850
$800
$750
$700
$675
$650
$600

$30.5
$58.0
$96.1
$155.6
$244.0
$285.9
$266.9
$308.8
$346.9
$366.0

$30.5
$88.5
$184.5
$340.1
$584.1
$870.0
$1,136.9
$1,445.7
$1,792.6
$2,158.6